September 2026 · 4 min read · Delaney Construction Projects
What plans, selections and approvals need to be finalised before construction — or before costs can be confirmed?
When it comes to starting your build, there are two critical milestones: having everything approved so construction can legally begin, and having enough detail locked in so your builder can accurately determine costs.

Before construction can begin
To break ground, you'll need more than just a design idea. The following documents and approvals are typically required:
- Architectural Plans – detailed drawings of the proposed design
- Engineering Plans – structural details such as footing design, framing, and load-bearing elements
- Boundary Survey – to confirm property lines and avoid disputes
- Development Application (DA) Approval – council approval for the proposed works (if required)
- Construction Certificate (CC) – issued after DA approval, confirming your plans comply with building codes and regulations
- Stamped Plans by Certifying Authority – the official “green light” to begin work
Before costs can be determined
With the documents above in place, your project is legally ready to move into construction. But to prepare an accurate estimated cost breakdown and develop an initial budget, builders only need two of them: architectural plans and engineering plans. These give enough detail to price up the structure, site preparation, and general requirements of the build.
While approvals (DA, CC, stamped plans, etc.) aren't strictly required at this stage, they are helpful — because they show the project can legally proceed. This saves everyone from investing time in a detailed quote for something that may not get council approval.
If you're aiming for a fixed-price contract
You'll need to go a step further and finalise:
- Electrical and Lighting Plans
- Cabinetry and Joinery Drawings
- Fixtures and Fittings Schedules (bathrooms, kitchens, laundry, etc.)
- Finishes Selections (mouldings, flooring, paint, tiles, hardware, etc.)
Our advice
The more selections locked in, the more precise the contract sum can be, with fewer provisional allowances.
Think of it this way: “plans and engineering are enough to budget”, but “approvals prove the job can be built”, and “selections give you cost certainty”. The more you have finalised before quoting, the smoother the process will be from start to finish.
Common questions
- What approvals do I need before building in NSW?
- Typically architectural plans, engineering plans, a boundary survey, Development Application (DA) approval where required, a Construction Certificate (CC) issued after DA approval, and plans stamped by the certifying authority — the official green light to begin work.
- What does a builder need to give me an estimate?
- Only architectural plans and engineering plans. These give enough detail to price the structure, site preparation and general requirements of the build. Approvals aren't strictly required at this stage, but they're helpful because they show the project can legally proceed.
- What do I need to finalise for a fixed-price contract?
- Beyond plans and engineering: electrical and lighting plans, cabinetry and joinery drawings, fixtures and fittings schedules, and finishes selections. The more selections locked in, the more precise the contract sum can be, with fewer provisional allowances.