Kahibah, Extension & renovation2025–26

Kahibah

This is the job Delaney documented most, start to finish. It began with an excavator and a subfloor in September 2025, ran through structural steel with BJL Welding & Fabrication and a full framing stage, and finished in September 2026 with a professional shoot: a living room under a raked white ceiling with plantation shutters, a main bathroom where “warm timber cabinetry meets natural stone,” a bedroom with “warm floors, soft light, room to breathe,” a laundry in timber, and a new timber stair. The driveway was poured last.

Scope

  • Two-storey extension and renovation
  • Structural steel, subfloor and new framing
  • Raked-ceiling living room, new stair
  • Main bathroom in timber and natural stone
Living room under a raked ceiling with plantation shutters and a grey modular sofa
Double vanity in warm timber with a natural stone top
Bedroom with timber floors, shutters and soft bedside light
The new timber stair with white balustrade
Laundry with a timber bench and strip lighting
Living and dining with plantation shutters, from the kitchen side
Framing stage — the two-storey structure standing
On the structural steel at Kahibah
The subfloor going in, September 2025
Excavation — TCW Excavations on site
The driveway pour, July 2026

On this project

  • Steel & fabricationBJL Welding & Fabrication
  • ExcavationTCW Excavations

From our Instagram

Filmed on site, as it happened.

Delaney post the build as they go — this is their own reel from this job.