The Delaney crew standing a timber wall frame on site

New builds — Newcastle, Lake Macquarie & the Hunter

NewcastleNew home builder.

Complete new homes from slab to handover, built by the same crew that does our renovation work.

Get a quote

New builds

Building new means starting with a blank canvas: a knock-down rebuild on your existing block, or a build on a new site. Every element can be designed around you, the home is built to today’s standards, and there are none of the compromises that come with working around an old structure.

A new build is also the most cost-effective time to build in energy efficiency, from orientation and insulation to solar and hot water.

From our own projects

One family weighed up extending their small 1950s home against starting fresh. The existing structure had significant problems with the plumbing, wiring and foundations, so renovating would have been a series of compromises. They chose a knock-down rebuild: a spacious, modern home with solar power, efficient insulation and a layout designed around how they live.

Pricing

Fixed price or cost-plus

When the plans and selections are finalised up front, which is more achievable on a new build, a fixed price can work well.

Lenders often prefer a fixed-price contract because they can see a defined contract amount, and there’s less need for you to review costs during construction.

What clients say

5.0Rated on Google

Rated 5.0 on Google by the people we’ve built for.

The process

No surprises, no guesswork.

Building shouldn’t feel like a black box. This is the path every Delaney Construction Projects job follows — from the first ballpark figure to the day you get your keys — and it’s the same process Tobin wrote up in his own building guide.

  1. 01

    Start with a realistic figure

    Tell us the ballpark you're comfortable spending before anyone draws anything. Shared early, it means the design is developed around your budget — not over it.

  2. 02

    Drafted plans to the builder

    Once you have preliminary designs, they come to us. We check the design actually lines up with the budget before you invest in detailed documentation.

  3. 03

    Engineering, then a real number

    If the estimate fits, an engineer prepares the structural plans. Architectural plus engineering plans are enough for us to price the job to within about 10–15%.

  4. 04

    Fixed-price or cost-plus

    We talk you through both. Fixed-price suits new builds with detailed plans; cost-plus suits renovations and extensions, where hidden conditions are common — and it's the fairer model.

  5. 05

    A contingency, and the build

    We recommend setting aside 10–15%. Then it's our crew on site, with Tobin across every stage — and on cost-plus, a cost report every fortnight.

  6. 06

    Handover

    Walked through, detailed and stood behind. No surprises, no guesswork — just clarity, control and confidence in where your money went.

FAQ

New builds: your questions

Usually when the existing structure is in poor condition (significant issues with plumbing, wiring or foundations), the block has untapped potential, or you’re ready for a major reset. Starting fresh gives you maximum design freedom and a modern, energy-efficient home built to today’s standards.

Beyond plans and engineering: electrical and lighting plans, cabinetry and joinery drawings, fixtures and fittings schedules, and finishes selections. The more selections locked in, the more precise the contract sum can be, with fewer provisional allowances.

You can save on a builder’s margin, but you take on full legal responsibility for safety, compliance and standards, a higher risk of delays and budget blowouts, and what is essentially a full-time job managing trades, scheduling and materials. For most homeowners, especially on larger or more complex builds, a licensed builder is the more cost-effective option in the long run.

Start a project

Tell us what
you’re building.

Send through whatever you’ve got — full plans, a rough sketch, or just an idea and a budget in mind. Tobin will come back to you to organise a chat.

Photos or plans (optional — images or PDF, up to 4)

No obligation — Tobin calls to talk it through and map out the next step. By sending it you agree to our privacy policy.

5.0on GoogleStart your project