
Decks & pergolas — Newcastle, Lake Macquarie & the Hunter
NewcastleDecks and pergolas.
Hardwood and composite decks, pergolas and covered alfresco areas.
Get a quoteDecks & pergolas
Some of the outdoor spaces we’ve built: a wrap-around hardwood deck and verandah on a country home at Dalwood, a roofed hardwood deck at Stockrington with a cantilevered flat roof and a timber-lined soffit, and a back deck with a fly-over roof around the spa in Charlestown.
Where a block carries a bushfire attack level (BAL) rating, the deck has to be built to it. On one job we built a hardwood deck on steel piers to meet the local BAL requirements.
Our decks & pergolas work




Pricing
Getting a price
For a fixed price, the details need to be decided before we quote: decking and screening, external stairs, balustrade, and any awning, carport or patio roof.
What clients say
5.0Rated on GoogleRated 5.0 on Google by the people we’ve built for.
The process
No surprises, no guesswork.
Building shouldn’t feel like a black box. This is the path every Delaney Construction Projects job follows — from the first ballpark figure to the day you get your keys — and it’s the same process Tobin wrote up in his own building guide.
- 01
Start with a realistic figure
Tell us the ballpark you're comfortable spending before anyone draws anything. Shared early, it means the design is developed around your budget — not over it.
- 02
Drafted plans to the builder
Once you have preliminary designs, they come to us. We check the design actually lines up with the budget before you invest in detailed documentation.
- 03
Engineering, then a real number
If the estimate fits, an engineer prepares the structural plans. Architectural plus engineering plans are enough for us to price the job to within about 10–15%.
- 04
Fixed-price or cost-plus
We talk you through both. Fixed-price suits new builds with detailed plans; cost-plus suits renovations and extensions, where hidden conditions are common — and it's the fairer model.
- 05
A contingency, and the build
We recommend setting aside 10–15%. Then it's our crew on site, with Tobin across every stage — and on cost-plus, a cost report every fortnight.
- 06
Handover
Walked through, detailed and stood behind. No surprises, no guesswork — just clarity, control and confidence in where your money went.
FAQ
Decks & pergolas: your questions
Typically architectural plans, engineering plans, a boundary survey, Development Application (DA) approval where required, a Construction Certificate issued after DA approval, and plans stamped by the certifying authority, which is the official green light to begin work.
Compliance and safety, organising reliable trades and established suppliers, and the quality of the work itself, backed by insurances and warranties that protect you long after handover.
Where we’ve done it
Before you build
Other work we do
Start a project
Tell us what
you’re building.
Send through whatever you’ve got — full plans, a rough sketch, or just an idea and a budget in mind. Tobin will come back to you to organise a chat.


